One Step Procedure for STO between storage locations

When you use “Set Up Stock Transfer Between Storage Locations” you can activate “Stock Transfer According to One-Step Procedure” with same plant as “Supplying (Issuing) Plant in Stock Transport Order” as the receiving plant in the following config node:

Materials Management –> Purchasing¬† –>Purchase Order –>Set up Stock Transport Order –>Assign Document Type, One-Step Procedure, Underdelivery Tolerance

If you set the indicator for the one-step procedure, the goods receipt is posted in the receiving plant at the same time as the goods issue is posted in the issuing plant. In case of STOs between storage locations, both these plant can be the same plant and SAP allows this for this case.